Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine

Product Details
Customization: Available
After-sales Service: 24hours Eigneer Online Technology Support
Warranty: Two Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
295604.36 USD
Plant Area
715 square meters
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
  • Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Find Similar Products
  • Overview
  • Product Description
  • Final Product
  • Detailed Photos
  • Product Parameters
  • Recommend Products
  • Company Profile
  • Production Process.
  • FAQ
Overview

Basic Info.

Model NO.
BDCGF18-18-6
Type
Gravity Filling Machine
Automatic Grade
Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Gravity Filling Machine
Filling Principle
Atmospheric Pressure
Packaging Container Lifting Structure
Chute Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Keywords
Glass Bottle Juice Tea Hot Filling Machine
Processing Types
Automatic Bottle Rinsing Filling Capping Machine
Usage
Beverage Filling Packaging
Capacity
2000-30000bph
Material
Stainless Steel 304/316
Bottle Type
Pet Plastic Bottle/Glass Bottle
Electric Control
PLC (Siemens)
Filling Accuracy
99.5%
Suitable for
Fruit Juice/Energy Drink/Cola Water
Machine Video Delivery Inspection
Provided
Bottle Volume
200ml-2L
Certification
CE, ISO, SGS
Transport Package
Exported Standard Wooden Case
Specification
15CBM
Trademark
ACE-FILLING
Origin
Zhangjiagang City, Jiangsu Province, China
HS Code
8422301090
Production Capacity
120PCS/Year

Packaging & Delivery

Package Size
220.00cm * 180.00cm * 200.00cm
Package Gross Weight
800.000kg

Product Description

 

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Ace-filling Machine.
Ace-filling (Suzhou) Packaging Machinery Co., Ltd. is a professional manufacturer of liquid beverage packaging solutions. We supply water treatment, water filling production line, carbonated drink making filling production line, juice making filling production line, 5 gallon filling production line, labeling machine and shrink packing machine.
Product Description

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
ACE-Filling Glass Bottle Filling Machine.

This equipment is used to produce glass bottle alcohol,carbonated soft drink, such as beer cola, soda water, soft drink, energy drink, sparkling water, lemonade , tonic waterand other carbonated soft drink.This equipment integrates full automatic rinsing, filling and capping. lt adopts isobaric filling technology and equipped with CO2 pressure control system. it has precise control and stable liquid level control. lt is equipped with many jam bottles, bottle missing, cap missing alarm and overload protection devices to ensure the quality of finalproducts. The main engine is controlled by advanced PLC, and the main electrical componentsare all of the world famous brands.
Final Product
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine Equipment Type Automatic 
Bottle Type
Glass round or square bottle
Volume 30 - 500ml
Bottle diameter 50-115mm
Bottle height 160-320mm
Capacity (500ml) Up to 30000BPH
Your product beer/carbonaetd soft drink/soda water/cola and so on.
Detailed Photos

 

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine

Washing part

<1>All 304/316 stainless steel rinse heads, water spray style inject design, more save water consumption and more clean .
<2>304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing.
<3> 304/316 stainless steel washing pump make the machine more durable .

 

Filling part

<1> 304/316 Stainless steel high precision filling nozzle.
<2> Filling volume adjustable in fine rank, same liquid level after filling.
<3> All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean.
<4> 304/316 stainless steel filling pump.

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Capping part

<1> Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping.
<2> All 304/316 stainless steel construction.
<3> No bottle no capping.
<4> Automatic stop when lack of bottle.
<5>Capping effect is stable and reliable ,Defective rate ≤0.2% .
 
Product Parameters
Model BDCGF8-8-3 BDCGF16-12-6 BDCGF18-18-6 BDCGF24-24-8 BDCGF32-32-10 BDCGF40-40-10
Capacity(for 500ml) 2500-3000 3500-4000 4500-6000 8000-12000 12000-14000 15000-18000
Suitable bottle shapes Glass/PET bottle
Bottle volume 200ml ~ 1L
Bottle height (mm) 160-320mm
Compressor air 0.3-0.7Mpa
Washing meidium Aseptic water 
Rinsing pressure >0.06Mpa <0.2Mpa
Total power (KW) 3.91kw 4.61kw 4.61kw 5.41kw 6.41kw 9.63kw
Overall dimensions 2.3*1.9m 2.5*1.9m 2.8*2.15m 3.1*2.5m 3.8*2.8m 4.5*3.3m
Height  2.3m 2.5m 2.5m 2.5m 2.5m 2.6m
Weight(kg) 2500kg 3200kg 4000kg 4500kg 6500kg 8000kg
 
Recommend Products
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
                         Bottle Water Filling                                             Juice Tea Hot Filling                                 Carbonated Soft Drink Filling  
 
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine
            3-5 Gallon Barrel Water Filling                                        Glass Bottle Filling                                                 Can Filling
       
Company Profile

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling MachineTurnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling Machine

Production Process.

Turnkey Project Glass Plastic Bottle Carbonated Soft Drink Sparkling Water Filling Production Line CSD Beverage Glass Bottle Bottling MachineIn the production process, we strictly control the quality of the product. It consists of ten processes, including welding,drilling,bending,machining,assembling,bebugging&test and acceptance. After repeated testing, the practice finally put into use.

FAQ

Q:Are you a manufacturer or trading company?
A:We are a manufacturer in beverage machine field more than 10 years, located at Leyu town, Zhangjiagang, 1.5 hours from Shanghai,1 hour from Wuxi by car. We will pick you up to visit our factory.

Q:Do you have any certification?
A:SGS,ISO,CE

Q:What about the delivery time?
A:Usually 45 Working days

Q:What about the machine's capacity?
A:2000-30000 bottles in 500ml per hour.

Q:The after-sale service
A:24 months warranty. Solve basic questions by phone, email, whatsapp, Wechat and video call. Engineer will go to buyer's factory to install, test machines, and train buyer's staff how to operate, maintain machines. Operating manuals will be sent with machine or by email.

Q:If our bottle size changes, can we just do some adjustment on machine according to our new bottle?
A:Yes.

Q: If I want to buy a machine, what information do I need to tell you, what information do you need from me?
A:1. What kind beverage you want to produce?
   2. What kind of bottle and cap you will use?
   3. Bottle volume? 250ml, 330ml, 500ml, 750ml, etc.?
   4. Producing speed requirement? How many bottles per hour?
   5. Raw water analysis report .
   6. Power supply.


Q:What kinds of product you supply?
A: Drink water/juice/carbonated drink filling line. 5 gallon/20L/ can beverage/glass bottle beverage filling line Water treatment system. Bottle blowing making machine. After packing system(label machine, PE film shrink packing machine, carton machine)

 
* Please do not hesitate to contact us if you want more details!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now